全国24小时热线电话:

159-1008-1959(点击拨打)

您现在的位置:首页新闻中心教大家升降机拆卸步骤
推荐产品

Similar products

教大家升降机拆卸步骤

1、首先将围栏系统和限位拆除,将副钢丝绳拆除,将一边吊笼拆除,将带有天窗一边的吊笼部件拆除,在吊笼框内用抱箍等把吊杆紧固。
Lift manufacturers introduced first fence system and limit removed, the deputy rope removed, the side of the cage removed, the side of the cage with a skylight parts removed, the box in the cage with a hoop and other fastening the boom.

2、其次把平衡铁架拆除,然后将第一道缆风绳拆除,在顶框边绑扎一根长1m的脚手架钢管并挂上一个可吊重量为0.5T~1T的开口滑轮。把导向抡附件安装于标准节的侧上方。
Second, the balance comes to lift manufacturers formwork removal, then the first wind cable rope removed, lashing at the top rim of a long 1m steel scaffolding and hang a weight hanging pulley opening of 0.5T ~ 1T. The guide picked

accessory mounted on the upper side of the standard section.

3、再拆除曳引钢丝绳,拆掉曳引轮,装上拆卸卷筒,将拆卸钢丝绳从卷筒引出,经过导向轮,顶滑轮后向下,中部系紧于吊杆的内下杆处,末端从吊杆滑轮处引出。
Lift manufacturers say then remove the traction rope, removed the traction wheel, mounted on the reel demolition, the removed the rope from the drum leads, through the guide wheel, pulley after top-down, central lacing on the next shot at the boom , drawn at the end of the boom pulley.

4、最后将标准节逐一拆除,当拆到缆风绳时,要先将缆风绳拆除后方可拆卸标准节,将曳引机构及基础节拆除。
Lift manufacturers introduced one by one and finally the standard section removed, when split to wind cable rope, first dismantle the wind cable rope standard removable rear section, the traction mechanism and the basis of section

removed.

上一篇:升降货梯储罐简介        下一篇:升降货梯液压部件工作原理
联系我们:
 
联系人:王经理
 
热线:159-1008-1959
 
网 址:www.jntr168.com
 
邮 箱:jntrjixie@163.com
 
地址:山东省济南市济阳区济阳街道工业园15-4号
微信二维码:

扫描二维码 沟通洽谈
短信 电话

请长按保存二维码后点击确定按钮,进入微信扫一扫界面,点击右上角‘相册’选择我们的二维码,再点击右上角‘完成’识别添加。
(为防止浏览器错误识别,请勿直接在浏览器中识别二维码)

确定